The project was in three phases, with Prodesign involved in all of them, started in 2005. The 550-bed hospital has been upgraded with state-of-the-art M&E systems, with a strong emphasis on renewable energy technologies and green material specifications. Prodesign services included power, HVAC, drainage and plumbing, medical gas, CCTV, telemedicine, lighting, security, nurse call systems, operating-theatre ventilation and air conditioning. The renovation contract fell under stage III of the Hospital Master Plan and included the rehabilitation of existing buildings (Doctors’ Mess, the Post-natal Ward and the H-Block Building), demolition of obsolete buildings and completion of site infrastructure to link up with Stage II of the Master Plan.
SERVICES PROVIDED:
- LV power supply
- Electrical generation
- Low voltage distribution/small power distribution
- General and emergency lighting/external lighting
- Telecommunications and data transmission/CCTV system
- TV distribution system
- Fire-detection and alarm systems
- Earthing and bonding
- Lightning protection system
- General ventilation system
- Air-conditioning system
- Toilet air-extraction system
- Building management system
- Foul drainage provision above and below ground
- Hot and cold water supply and distribution system
- Portable fie extinguishers
- Fire hose reels