1Cybercity Phase 2

Prodesign was appointed for the design of Phase 2 of 1Cybercity, a Grade A office in a prime location in Ebene Cybercity. Phase 1 was completed in December 2007 and it is recognized as a landmark in the Ebene Cybercity landscape. Naturally, the client came to us for this extension as Phase 1 was a resounding success.

Prodesign provided a dedicated team of building services engineers to work on the following services of Phase 1: lifts, standby generator, plumbingdrainage, ventilation, normal power and standby generation, fire and protection systems, security and network installation, external lighting and site servicesBMS  and CCTV 

For Phase 2, our M&E engineers provided full design and contract administration services for the shell and core areasOur MEP Consultants started working on this project in February 2016 and the project was successfully delivered in November 2018.  

Prodesign’s general MEP engineering services provided: 

• Foul drainage above and below ground
• Cold water supply
• Fire hose reels
• Hydrants (wet risers)/ sprinklers
• Portable fire extinguisher
• Fire detection and alarm
• General ventilation/toilet ventilation
• LV distribution and LV Power
• General lighting
• Emergency lighting and external lighting
• Telecommunications
• CCTV system
• Earthing and bonding
• Lightning protection
• Vertical transportation system (Lifts)
• Reclaimed water system

Facts and figures 

Client: MaxCity Ebene Ltd 

Architect: Francis Wong Associates Ltd 

Started: February 2016 

Ended: November 2018 

Location: Ebene 